External Publications
2019.16
Date: 3/5/2019

Pathways to 100% Electrification in East Africa by 2030


Authors:
Giacomo Falchetta (Fondazione Eni Enrico Mattei); Manfred Hafner (Fondazione Eni Enrico Mattei); Simone Tagliapietra (Fondazione Eni Enrico Mattei)
Type: Journal
Published in: The Energy Journal, Volume 41, Number 3, May 2020
Keywords: Electricity access, Electrification modelling, Energy scenarios, Utilities policy, East Africa

Abstract

In spite of abundant generation potential, as of 2019 East Africa has an electricity access level of 36%, with over 140 million people without service. Here, a bottom-up geospatial model (OnSSET) is used to estimate least-cost pathways to universal access to electricity by 2030 for different consumption-tier objectives under three regional grid electricity generation mix scenarios. Results suggest median total required investments of $57 and $110 billion for guaranteeing basic (160 and 44 kWh/person/year in urban and rural areas) and moderate - i.e. including potential to enable some productive uses - (423 and 160 kWh/person/year) consumption for newly connected households by 2030, respectively. This corresponds to an average of $5.6 billion/year, and implies median capacity additions of 12.2 GW (59% on-grid, 37% mini-grids, and 4% standalone solutions). At least further $2.7 billion/year in generation capacity are required to satisfy the projected demand growth from already electrified consumers. A grid electricity scenario with 25% lower photovoltaic costs and a higher penetration of renewables reveals to be up to 10% cheaper and 46% less carbon-intensive, while also requiring less up-front investment. To achieve such objectives, investment must be channelled within an enabling policy environment, which we discuss.

links
Link
Pathways to 100% Electrification in East Africa by 2030

FEEM Newsletter & Update

Subscribe to stay connected.

Your data will be processed by FEEM - Eni Enrico Mattei Foundation - Data Controller - to receive the Foundation's Newsletter & Update via e-mail. To send the requested information, the Data Controller uses e-mail sending service providers established in the U.S.A .: for this, your consent to the transfer of your email address to the U.S.A. is required, without which it will not be possible to comply with your request. We invite you to consult the complete information to obtain detailed information to protect your rights.